What aspects should we start with in decoration ac

2022-07-22
  • Detail

Decoration is a time-consuming and energy-consuming thing, coupled with the continuous improvement of people's aesthetic outlook. Therefore, many families are willing to entrust the decoration of new houses to decoration companies. This not only saves time and effort, but also meets the aesthetic requirements. However, after being the shopkeeper, we still can't relax our vigilance, especially in the final acceptance. After the decoration is completed, we must be careful when checking and accepting, mainly from the following four aspects

1. Water and electricity acceptance

although the pressure test has been carried out on the waterway during the mid-term acceptance of the decoration project, the acceptance of concealed works has also been carried out for the closed water test and circuit laying, and the project acceptance sheet has been signed by the owner, foreman and supervisor, and the pipeline has been basically guaranteed. However, hydropower projects also involve the installation of waterway accessories, electrical accessories, lamps, electrical products, etc., so it is still one of the key points of the completion acceptance of decoration projects

the installation and acceptance of the circuit is mainly to check whether the lighting and power on are normal through the trial lighting of lamps and the trial control of switches. The owner can also test each socket with an electrician professional test pencil to see whether it is powered on, and turn on the switches to see if there is a problem

the installation and acceptance of waterway is mainly to check whether the pipeline is firm. You can turn on the tap to check whether it will shake; In addition, it also needs to see whether the water supply of the water pipe is unblocked and whether there is water leakage. It mainly depends on whether there are water drops or leakage at the position of the joint and elbow. You can take a paper towel to wipe the joint and elbow for detection

in addition, it is necessary to check whether the room with floor drain exists “ Flashing and “ In case of adverse slope, you can turn on the faucet or sprinkler, and after a period of time, check whether the ground water is smooth and whether there is local ponding. In addition, a water test should also be conducted to check whether the drainage of floor drains, toilets and basins is smooth

2. Acceptance of wall and floor tiles

acceptance of wall and floor tiles first depends on whether the brick surface is flat, whether the gap of the brick surface is regular and consistent, and whether the brick surface is broken and collapsed. In addition, pay attention to whether the position of the tiles and waist line is correct, and there is no deviation or height error

in addition to external considerations, wall tiles and floor tiles also need to detect the internal hollowing rate. The owner can use a small metal hammer to gently tap the four corners and the middle of the wall and floor tiles to see if there is a hollow sound. The local hollowing rate of wall and floor tiles shall not exceed 5% of the total paved area, otherwise falling off will occur

3. Woodworking acceptance

for the wooden door made on site, it is required to check whether the opening direction of the door is reasonable, whether it is flexible when opening, and whether there is any blockage and rebound. In addition, check whether the door seam is reasonable. The door seam above and around the wooden door cannot exceed 3mm, and the lower seam is generally 5-8mm. In addition, check whether the seam of the door pocket is tight. For the cabinet door, it depends on whether the switch is normal. When the cabinet door is opened, it should be easy to operate without abnormal sound. In addition, check whether the cabinet door handle and various locks are installed in the correct position and opened normally

4. Paint acceptance

after the paint is dry, the method of visual inspection and hand feeling shall be adopted for paint acceptance under natural light. During acceptance, pay attention to check that the variety, color and coating film of the coating should be consistent with the template. The paint surface shall be flat and smooth; The varnish has clear wood grain, no edge wrapping, adhesion and wrinkle on the large surface, and the color is basically the same without brush grain; The emulsion paint on the wall has no peeling, missing painting, and revealing problems. There is no sagging and wrinkled skin on the large surface, and the surface color is consistent without obvious brush lines